In support of RTG’s proposal to the DePue Group for providing turnkey services, a treatability study was performed on the groundwater to be treated. Based on the results of the RTG treatability study, a design was proposed for the plant. RTG was successful with the proposal and was awarded the contract. It should be noted that in addition to providing design/construction services, RTG provided support to the DePue Group with multiple regulatory and permitting issues. The Plant is designed to treat 25 to 125 gpm of water continuously, with operations personnel needed only during normal daytime working hours. The water treated is high in metals concentrations (3,500 ppm), with zinc being the metal present in the most significant concentration. Primary unit operations in the facility include (see attached process flow diagram):
The process produces a sludge underflow from the clarifier/thickener. The thickened sludge is dewatered to approximately 25 to 30% solids by weight. Dewatered sludge is blended with an additive (kiln dust) to ensure that the sludge passes TCLP. RTG managed construction of the facility and completed start-up
operations. In addition to the base treatment facility, RTG was responsible for
construction of a lift station and interceptor system to collect the
contaminated gro
|
|
|